Property inspection and snagging in Cyprus

Before you buy. Before you take the keys.

Our civil engineer inspects resale homes and new builds, and gives you a signed report with photos.

WhatsApp us

English, Greek, Russian or Ukrainian. We aim to reply within an hour in working hours.

Constantinos LoizouCivil Engineer, ETEKGoogle reviews: 5.0 (8)
What do you need?
A real case

What our engineer found in two new apartments

Larnaca, January 2026, before handover. More than 20 problems, two of them dangerous.

  • A gap at the top step

    The last step to the roof terrace stood off the floor. Someone could fall.

  • Not built as the plans show

    The kitchen was moved and the island was missing.

  • Water that doesn't drain

    Rain stayed on the balconies, the terrace and the parking floor.

  • Badly cut tiles

    Chipped tile edges in both bathrooms.

We went back in May. The balcony glass was still missing and new cracks had appeared. That is why we check the repairs too.

Photos from our signed report, with the address and names removed.

What we check

What our engineer checks

Structure and cracks

Cracks, movement and other signs of a problem in the structure.

Damp and waterproofing

Balconies, roof, showers and drains: anywhere water can get in or stay.

Finishes and workmanship

Floors, walls, tiles, doors and windows.

Visible services

The electrics, plumbing and ventilation that can be seen and tested.

Built as the plans show

Whether the home matches the approved plans: the layout, the kitchen, the doors and the bathrooms.

Plot and shared areas

Entrance, parking, roof and drainage, and for a house, the plot.

It is a visual inspection. We test what can be tested, like doors, windows, taps and sockets, but we don't open walls or floors.

What you get

A signed report you can use

  • What is urgent, and what can wait
  • Photos of the problems, marked in red
  • What we recommend doing
  • Usually in 2 to 3 days, explained on a call in your language
A real page from that report. Tap to enlarge.
Get a sample report
Constantinos F. Loizou
Who inspects

An engineer who works only for you

Constantinos F. LoizouFounder & Director, Civil Engineer, ETEK

He has designed and engineered buildings in Limassol since 2009. He does the inspection himself and signs every page.

Google reviews: 5.0 (8)
  • Registered with ETEK since 2012, no. A142509
  • Insured for professional liability
  • We never inspect a building we designed, built or sold
  • We take no money from developers, sellers or agents
More about Constantinos
Price

Price and next steps

From €500

We inspect anywhere in Cyprus. The exact price depends on the size of the home and where it is, and we confirm it in writing before any work begins.

Living abroad?

You don't need to fly in. We arrange the keys with the developer, show you the home on a live video, file the report with the developer and follow the repairs until they are closed.

Checking the repairs?

We come back after the developer's repairs and tell you what is fixed and what is not. We agree it with you in writing first.

  1. 1

    Tell us about the home

    On WhatsApp, by phone or with the form.

  2. 2

    Agree the price

    In writing, before any work begins.

  3. 3

    Inspection and report

    The report usually comes in 2 to 3 days, longer for a complex building.

See how we inspect, step by stepGot a message from your developer about handover? Forward it to us on WhatsApp. We'll tell you what to do next.
Your next step

Leave your number. We'll call you.

Or write to us on WhatsApp. We aim to reply within an hour in working hours.

Constantinos LoizouCivil Engineer, ETEKGoogle reviews: 5.0 (8)

Leave your number

What is it about?
How should we reach you?
Add a message or details

We use your details only to answer this request. See our Privacy Policy.

Questions

What buyers ask us

The developer has an engineer. Why do I need one?

The developer's engineer works for the developer. Ours works only for you.

Can I bring my own engineer to the handover?

Yes, ask for it. Tell the developer your engineer is coming with you on the date, and we will help you word the message. If they resist, tell us before you accept the home.

Is this like a UK snagging survey?

It does the same job: an independent check of a new home before you accept it, with a list of what needs fixing. Here it is done by a civil engineer registered with ETEK, the Cyprus technical chamber.

What language is the report in?

English, which most of our clients prefer. If you want it in Greek, Russian or Ukrainian, tell us when you book. Either way, we go through it with you on a call in your language.

What if the developer doesn't fix the defects?

The signed photo report helps you and your lawyer. We can return to check the repairs, but we can't force the developer to fix them.

Does this solve title deed problems?

No. We check the permit documents and tell you what we see, but an engineer's report doesn't fix a title deed problem. For that you need your lawyer.